Engineering, design and commissioning of three 90/37kW power packs for use with dry bulk ship (un)loaders, destined for use in New Zealand. The job consisted of:
two 90/37kW power-pack
one 37/7.5kW power-pack
These power packs were installed on three dry bulk ship (un)loaders, that have been built in the Netherlands with their final destination being New Zeeland. The engineering of these power-packs was quite a challenge due to the system requirements and available space. Working in close cooperation with the customer, the systems were finally delivered to the total satisfaction of the end user.
See also our customers project movie:
We speak the language of our customers and know how to get things moving quickly.
We have more than twentyfive years of experience in complex projects. We are particularly strong in engineering and project management.
Together we can arrive at a smart solution that works and can be delivered within budget and on time.